2006-2015 INDOT long range transportation plan - new construction projects only |
TOTAL COST = $6,345,795,000
|
|
|
|
|
|
|||
|
district |
road |
year |
cost (1,000s) |
location |
description |
On survey? |
|
|
Allen |
Fort Wayne |
S1 |
2007 |
$12,018 |
I-69 to 0.21 mi east of Tonkle Rd, north of Fort Wayne |
Added Travel Lanes |
yes |
|
Allen |
Fort Wayne |
S3 |
2007 |
$33,295 |
Ludwig Rd to Dupont Rd |
Added Travel Lanes |
yes |
|
Allen |
Fort Wayne |
I69 |
2007 |
$36,930 |
0.48 mi south of Coldwater Rd to 0.86 mi north of SR 1 |
Added Travel Lanes |
yes |
|
Allen |
Fort Wayne |
S14 |
2008 |
$13,908 |
Scott Rd to Hadley Rd |
Added Travel Lanes |
yes |
|
Allen |
Fort Wayne |
U24 |
2008 |
$21,567 |
0.5 mi E. of I-469 to 0.5 mi E. of Ryan/Bruick Rd w/ interchange (Phase I) |
New Road Construction |
yes |
|
Allen |
Fort Wayne |
U24 |
2008 |
$25,113 |
0.5 mi W. of SR 101 to Indiana/Ohio State Ln w/ SR101 interchange (Phase 4) |
New Road Construction |
yes |
|
Allen |
Fort Wayne |
U30 |
2008 |
$1,790 |
US 33 to I-69 at Fort Wayne |
Added Travel Lanes |
yes |
|
Allen |
Fort Wayne |
U30 |
2008 |
$2,020 |
At US 33, 0.66 mi west of I-69 at Fort Wayne |
interchange modification |
? |
|
Allen |
Fort Wayne |
U30 |
2008 |
$4,340 |
1.6 mi west of US 36 (Flaugh Rd) to US 33 |
Added Travel Lanes |
no |
|
Allen |
Fort Wayne |
U24 |
2009 |
$21,923 |
0.5 mi E. of Ryan/Bruick Rd to 0.5 mi E. of Webster Rd w/ interchange (Phase II) |
New Road Construction |
yes |
|
Allen |
Fort Wayne |
U24 |
2011 |
$22,000 |
From 0.5 mi east of Webster Rd to 0.5 mi west of SR 101 (Phase III) |
New Road Construction |
yes |
|
Allen |
Fort Wayne |
U24 |
2012 |
$31,025 |
New Interchange at US 24 & I-469 N/E of Ft. Wayne |
Interchange Construction |
? |
|
Allen |
Fort Wayne |
S37 |
2013 |
$1,700 |
I-469 to Doty Rd |
Added Travel Lanes |
no |
|
Allen |
Fort Wayne |
S930 |
2013 |
$8,000 |
2.6 mi west of I-469 (Lincoln Ave) to 0.7 mi west of I-469 (Minnich Rd) |
Added Travel Lanes |
yes |
|
Allen |
Fort Wayne |
S14 |
2014 |
$771 |
Hadley Rd to I-69 |
Added Travel Lanes |
no |
|
Allen |
Fort Wayne |
S14 |
2015 |
$9,200 |
West Hamilton Rd to Scott Rd |
Added Travel Lanes |
no |
|
Bartholomew |
Seymour |
U31 |
2006 |
$18,863 |
CR 50N, 1.48 mi south of old SR 46 to 2.46 mi north of old SR 46 |
Added Travel Lanes |
yes |
|
Bartholomew |
Seymour |
S46 |
2007 |
$4,090 |
State St from Marr Rd to Mapleton/Pence St in Columbus |
Median Construction |
yes |
|
Bartholomew |
Seymour |
I65 |
2013 |
$26,300 |
0.5 mi S of US 31 to 0.5 mi S of SR 252 |
Added Travel Lanes |
no |
|
Boone |
Crawfordsville |
U421 |
2011 |
$15,000 |
121st St to 146th St |
Added Travel Lanes |
yes |
|
Boone |
Crawfordsville |
I65 |
2013 |
$16,300 |
At the SR 39 Interchange |
interchange modification |
no |
|
Boone |
Crawfordsville |
I65 |
2013 |
$9,715 |
I-465 Northwest Connector to 0.5 mi north of SR 334 |
Added Travel Lanes |
yes |
|
Boone |
Crawfordsville |
I65 |
2013 |
$85,410 |
0.5 mi north of SR 334 to US 52 |
Added Travel Lanes |
yes |
|
Carroll |
LaPorte |
S25 |
2007 |
$70,829 |
0.2 mi E of Carroll CR400W to Cass CR300S (Segment 3) |
New Road Construction |
yes |
|
Carroll |
LaPorte |
S25 |
2007 |
$60,870 |
0.5 mi E of Tippecanoe/Carroll Co Ln to 0.2 mi E of Carroll CR 400W (Seg 2) |
New Road Construction |
yes |
|
Cass |
LaPorte |
S25 |
2006 |
$44,376 |
From Cass CR 300S to US 24/US 35 (Segment 4) |
New Road Construction |
yes |
|
Clark |
Seymour |
I265 |
2013 |
$129,024 |
Extend I-265 into Kentucky (Road) |
New Road Construction |
? |
|
Clark |
Seymour |
I265 |
2013 |
$101,376 |
Extend I-265 into Kentucky (Bridge) (Indiana share) |
New Bridge Construction |
yes |
|
Clark |
Seymour |
I65 |
2013 |
$249,600 |
New Ohio River Bridge |
New Bridge Construction |
yes |
|
Clark |
Seymour |
I65 |
2014 |
$34,110 |
0.5 mi south of SR 311 to 0.5 mi north of Memphis Rd |
Added Travel Lanes |
yes |
|
Clark |
Seymour |
I65 |
2015 |
$18,000 |
From 0.5 mi north of Memphis Rd to 0.5 mi north of SR 160 |
Added Travel Lanes |
yes |
|
Clinton |
Crawfordsville |
I65 |
2008 |
$8,400 |
At SR 28 (two additional lanes on SR 28 through the interchange) |
interchange modification |
yes |
|
Clinton |
Crawfordsville |
U421 |
2012 |
$2,283 |
Jackson St (SR 39) to Wabash St |
TSM |
yes |
|
Clinton |
Crawfordsville |
S28 |
2014 |
$1,500 |
5th St to Jackson St (SR 39) in FrankFort |
Added Travel Lanes |
no |
|
Daviess |
Vincennes |
U50 |
2014 |
$17,400 |
Washington Bypass to 1.1 mi west of Daviess / Martin Co Ln |
Added Travel Lanes |
no |
|
Dekalb |
Fort Wayne |
S8 |
2008 |
$2,270 |
Depot St to CR 40A (Auburn-Butler Rd) in Auburn |
TSM |
no |
|
Dekalb |
Fort Wayne |
S8 |
2012 |
$5,500 |
SR 327 to 0.15 mi west of I-69 |
Added Travel Lanes |
yes |
|
Delaware |
Greenfield |
S32 |
2007 |
$12,540 |
CR 575W (AdaLn St) to CR 400W (Nebo Rd) in Yorktown |
Added Travel Lanes |
yes |
|
Delaware |
Greenfield |
S32 |
2008 |
$20,650 |
0.3 mi E of Muncie Bypass (Country Club Rd) to 4.2 mi E of Muncie Bypass |
Median Construction |
yes |
|
Delaware |
Greenfield |
U35 |
2008 |
$1,630 |
At Centennial Ave, 1.61 km north of SR 32 |
New Bridge Construction |
no |
|
Delaware |
Greenfield |
S67 |
2008 |
$7,600 |
US 35 / SR 3 to the south jct with SR 28 |
Median Construction |
yes |
|
Delaware |
Greenfield |
S67 |
2008 |
$4,730 |
At Norfolk Southern RR, 2.11 km south of SR 3 |
New Bridge Construction |
yes |
|
Delaware |
Greenfield |
S67 |
2009 |
$17,000 |
South jct with SR 28 to SR 167 |
Median Construction |
yes |
|
Delaware |
Greenfield |
I69 |
2009 |
$5,600 |
At SR 67 (Exit 34-Daleville) |
interchange modification |
yes |
|
Delaware |
Greenfield |
S67 |
2011 |
$9,779 |
At Cowan Rd, 2.07 mi west of SR 3 |
New Interchange Construction |
yes |
|
Delaware |
Greenfield |
U35 |
2012 |
$15,196 |
At McGalliard Rd, 1.86 mi north of SR 32 |
New Interchange Construction |
no |
|
Delaware |
Greenfield |
S3 |
2014 |
$1,500 |
From 1.3 mi N of SR3/67 (CR 450N) to SR 28 |
Median Construction |
no |
|
Dubois |
Vincennes |
U231 |
2011 |
$139,316 |
Huntingburg / Jasper Connector |
New Road Construction |
yes |
|
Elkhart |
Fort Wayne |
S19 |
2007 |
$10,626 |
2.6 mi north of US 20 (Lusher Ave) to 4.1 mi north of US 20 (Bypass) |
Median Construction |
no |
|
Elkhart |
Fort Wayne |
U33 |
2010 |
$11,418 |
College Ave to Monroe St in Goshen |
Added Travel Lanes |
yes |
|
Elkhart |
Fort Wayne |
U33 |
2010 |
$21,320 |
CR 40 to College Ave (CR 36) |
Added Travel Lanes |
yes |
|
Elkhart |
Fort Wayne |
U33 |
2010 |
$4,448 |
Monroe St to SR 15 (Main St in Goshen) |
Added Travel Lanes |
yes |
|
Elkhart |
Fort Wayne |
S15 |
2012 |
$1,500 |
West jct with SR 120 to east jct with SR 120 in Bristol |
TSM |
no |
|
Elkhart |
Fort Wayne |
S13 |
2013 |
$8,225 |
York St in Middlebury to SR 120 |
Added Travel Lanes |
no |
|
Elkhart |
Fort Wayne |
S13 |
2013 |
$3,375 |
SR 120 to I-80/90 |
Added Travel Lanes |
no |
|
Elkhart |
Fort Wayne |
S13 |
2013 |
$1,966 |
US 20 to York St in Middlebury |
TSM |
no |
|
Elkhart |
Fort Wayne |
U131 |
2013 |
$2,200 |
I-80/90 to Michigan State Ln |
Added Travel Lanes |
no |
|
Elkhart |
Fort Wayne |
S15 |
2013 |
$2,669 |
Mill St to CR 26 in Goshen |
Added Travel Lanes |
no |
|
Elkhart |
Fort Wayne |
S19 |
2013 |
$1,330 |
0.18 mi north of Roseland Rd to Michigan State Ln |
Added Travel Lanes |
no |
|
Elkhart |
Fort Wayne |
U20 |
2015 |
$9,485 |
1.25 mi east of CR 19 to SR 15 |
Added Travel Lanes |
yes |
|
Floyd |
Seymour |
S111 |
2007 |
$22,200 |
0.65 mi N of I-265 to Fairview Knob Rd (3 lns from Chapel Ln to Fairview Knob Rd) |
Added Travel Lanes |
no |
|
Floyd |
Seymour |
S111 |
2009 |
$6,350 |
Beechwood Ave to Mt. Tabor Rd |
Added Travel Lanes |
yes |
|
Floyd |
Seymour |
I64 |
2014 |
$11,200 |
I-265 to SR 111 |
Added Travel Lanes |
yes |
|
Gibson |
Vincennes |
S64 |
2006 |
$12,077 |
9th St to State St in Princeton |
Added Travel Lanes |
no |
|
Hamilton |
Greenfield |
S32 |
2006 |
$11,870 |
2.58 km west of US 31 to US 31 |
Added Travel Lanes |
yes |
|
Hamilton |
Greenfield |
S431 |
2007 |
$22,620 |
96th St to US 31 |
Added Travel Lanes |
yes |
|
Hamilton |
Greenfield |
I69 |
2008 |
$760 |
At SR 238 |
interchange modification |
no |
|
Hamilton |
Greenfield |
S32 |
2010 |
$3,830 |
SR 37 to the east jct with SR 38 |
Added Travel Lanes |
no |
|
Hamilton |
Greenfield |
I465 |
2011 |
$106,675 |
At US 31 (North Leg) (US 31 Freeway Upgrade) |
interchange modification |
no |
|
Hamilton |
Greenfield |
U31 |
2012 |
$483,000 |
From 0.2 mi south of I-465 to SR 38 Hamilton Co |
freeway Upgrade |
yes |
|
Hamilton |
Greenfield |
S37 |
2013 |
$60,000 |
I-69 to 6.0 mi north of I-69 at end of dual lanes |
Added Travel Lanes |
no |
|
Hamilton |
Greenfield |
S32 |
2014 |
$6,546 |
US 31 to Moontown Rd |
Added Travel Lanes |
yes |
|
Hamilton |
Greenfield |
S32 |
2014 |
$7,338 |
Moontown Rd to River Ave |
Added Travel Lanes |
? |
|
Hamilton |
Greenfield |
I69 |
2014 |
$30,000 |
From 116th Street/SR 37 to SR 238 |
Added Travel Lanes |
yes |
|
Hancock |
Greenfield |
I70 |
2006 |
$9,200 |
At Mt. ComFort Rd, 7.7 mi west of SR 9 |
interchange modification |
yes |
|
Hancock |
Greenfield |
U52 |
2008 |
$22,652 |
Marion / Hancock Co Ln to CR 500W |
Added Travel Lanes |
yes |
|
Hancock |
Greenfield |
U52 |
2008 |
$2,458 |
Gem Rd to Sugar Creek, 7.6 mi east of I-465 to 8.3 mi east of I-465 |
Median Construction |
no |
|
Hancock |
Greenfield |
I70 |
2010 |
$51,310 |
0.5 mi east of Mt. ComFort Rd to 0.8 mi east of SR 9 |
Added Travel Lanes |
yes |
|
Harrison |
Seymour |
I64 |
2015 |
$14,400 |
Placeholder for New Interchange W of SR 135 |
interchange |
yes |
|
Hendricks |
Crawfordsville |
S267 |
2006 |
$4,130 |
0.1 mi north of I-74 to 0.5 mi north of I-74 |
Added Travel Lanes |
no |
|
Hendricks |
Crawfordsville |
U36 |
2011 |
$44,400 |
SR 267 to I-465 |
Added Travel Lanes |
yes |
|
Hendricks |
Crawfordsville |
I74 |
2011 |
$9,000 |
At Hendricks Co North-South Corridor (CR 1000E) |
New Interchange Construction |
yes |
|
Hendricks |
Crawfordsville |
U36 |
2013 |
$26,000 |
Placeholder for US 36 Danville Connector Corridor/EA Study Recommendation |
New Road Construction |
no |
|
Howard |
Greenfield |
U35 |
2006 |
$36,050 |
Goyer Rd to Wildcat Creek, 0.5 mi east of US 31 to 6.7 mi east of US 31 |
Added Travel Lanes |
yes |
|
Howard |
Greenfield |
U31 |
2015 |
$130,000 |
South of SR 26 to SR 18 |
New Road Construction |
yes |
|
Jay |
Greenfield |
S67 |
2007 |
$11,200 |
1.59 mi south of SR 26 to US 27 |
Median Construction |
yes |
|
Jay |
Greenfield |
S26 |
2008 |
$2,405 |
Industrial Pkwy, 0.7 mi west of US 27 to US 27 |
Median Construction |
no |
|
Jefferson |
Seymour |
S62 |
2008 |
$10,029 |
SR 56 to Clifty Creek |
Added Travel Lanes |
yes |
|
Jefferson |
Seymour |
S250 |
2010 |
$10,000 |
From SR 7 to US 421 |
New Road Construction |
yes |
|
Jennings |
Seymour |
U50 |
2011 |
$9,000 |
Western UAB of North Vernon to 2.0 mi E of eastern UAB of North Vernon |
Added Travel Lanes |
yes |
|
Jennings |
Seymour |
U50 |
2011 |
$26,000 |
US 31 to the western UAB of North Vernon (RP 115+63) |
Added Travel Lanes |
yes |
|
Johnson |
Seymour |
S135 |
2008 |
$7,944 |
CR 700N (Stones Crossing Rd) to Smith Valley Rd |
Added Travel Lanes |
yes |
|
Johnson |
Seymour |
S135 |
2009 |
$10,700 |
SR 144 to Stones Crossing Rd |
Added Travel Lanes |
yes |
|
Johnson |
Seymour |
I65 |
2010 |
$30,930 |
0.5 mi S of Whiteland Rd to 0.5 mi S of Greenwood Rd |
Added Travel Lanes |
yes |
|
Johnson |
Seymour |
I65 |
2010 |
$11,000 |
0.5 mi S of Greenwood Rd (Main St) to 0.5 mi S of Co Ln Rd |
Added Travel Lanes |
yes |
|
Johnson |
Seymour |
I65 |
2011 |
$31,270 |
0.5 mi S of SR 44 to 0.5 mi S of Whiteland Rd |
Added Travel Lanes |
no |
|
Johnson |
Seymour |
I65 |
2012 |
$53,700 |
0.5 mi S of SR 252 to 0.5 mi S of SR 44 |
Added Travel Lanes |
no |
|
Kosciusko |
Fort Wayne |
S15 |
2007 |
$3,150 |
CR 250N to CR 600N in Warsaw |
Added Travel Lanes |
? |
|
Kosciusko |
Fort Wayne |
S13 |
2013 |
$3,530 |
CR 1200N to High St in Syracuse |
TSM |
no |
|
LaGrange |
Fort Wayne |
S9 |
2012 |
$735 |
US 20 to Michigan St in LaGrange |
TSM |
no |
|
Lake |
LaPorte |
U41 |
2006 |
$10,047 |
South of 175th St to north of 165th St (Section I) |
Median Construction |
no |
|
Lake |
LaPorte |
I80 |
2006 |
$106,585 |
At I-65 (0.4 mi west of Martin Luther King Dr to Central Ave) (Phase IV) |
interchange modification |
yes |
|
Lake |
LaPorte |
I80 |
2006 |
$30,666 |
At US 6 / SR 51 (Ripley St) in Lake Station |
interchange modification |
no |
|
Lake |
LaPorte |
U12 |
2008 |
$3,300 |
US 41 to 121st St in Hammond / Whiting |
TSM |
no |
|
Lake |
LaPorte |
S312 |
2008 |
$5,740 |
State Ln Rd to Sheffield Rd |
TSM |
no |
|
Lake |
LaPorte |
S912 |
2008 |
$100,050 |
0.63 mi north of I-80/94 to 0.25 mi north of US 12 |
Added Travel Lanes |
no |
|
Lake |
LaPorte |
S53 |
2009 |
$16,160 |
109th Ave to 93rd Ave in Crown Point |
Added Travel Lanes |
yes |
|
Lake |
LaPorte |
S53 |
2009 |
$2,200 |
53rd Ave to 35th Ave in Gary |
TSM |
no |
|
Lake |
LaPorte |
U231 |
2011 |
$1,250 |
East jct with SR 55 to west jct with SR 55 in Crown Point |
TSM |
no |
|
Lake |
LaPorte |
I65 |
2011 |
$35,000 |
US 231 to US 30 |
Added Travel Lanes |
no |
|
Lake |
LaPorte |
I65 |
2011 |
$12,000 |
At 109th Ave |
New Interchange Construction |
no |
|
Lake |
LaPorte |
S55 |
2012 |
$1,650 |
Clark St (north of US 231) to Summit Ave in Crown Point |
TSM |
no |
|
Lake |
LaPorte |
U6 |
2012 |
$7,500 |
0.3 mi south of I-80/94 to 0.4 mi east of SR 51 |
Added Travel Lanes |
no |
|
Lake |
LaPorte |
S2 |
2013 |
$5,520 |
Nicholas St to 4 lane section west of Clark St in Lowell |
TSM |
no |
|
Lake |
LaPorte |
S312 |
2013 |
$2,825 |
Columbia Ave (0.1 mi west of I-90) to Railroad Ave in East Chicago |
Added Travel Lanes |
no |
|
Lake |
LaPorte |
S53 |
2014 |
$2,000 |
25th Ave to US 12 in Gary |
TSM |
no |
|
Lake |
LaPorte |
U41 |
2015 |
$12,000 |
93rd Ave to 77th Ave |
Median Construction |
no |
|
LaPorte |
LaPorte |
U20 |
2006 |
$475 |
Reconstruct ramp from EB US 20 to EB US 20/35 |
interchange modification |
yes |
|
LaPorte |
LaPorte |
U20 |
2008 |
$9,825 |
US 421 to US 35 / SR 212 in Michigan City |
Median Construction |
no |
|
LaPorte |
LaPorte |
S2 |
2009 |
$2,979 |
SR 39 to US 35 in LaPorte |
TSM |
? |
|
LaPorte |
LaPorte |
U35 |
2009 |
$1,616 |
North jct with SR 39 to Johnson/Severs Rd in LaPorte |
TSM |
no |
|
LaPorte |
LaPorte |
U421 |
2009 |
$3,187 |
South jct with SR 2 to north jct with SR 2 in Westville |
Added Travel Lanes |
yes |
|
LaPorte |
LaPorte |
U421 |
2012 |
$10,900 |
South jct with SR 2 to north jct with SR 2 in Westville |
Added Travel Lanes |
yes |
|
LaPorte |
LaPorte |
U20 |
2013 |
$1,250 |
Ohio St to US 421 in Michigan City |
Added Travel Lanes |
no |
|
LaPorte |
LaPorte |
S39 |
2013 |
$1,189 |
US 35 to Severs Rd in LaPorte |
Added Travel Lanes |
no |
|
LaPorte |
LaPorte |
U421 |
2013 |
$4,819 |
North jct with SR 2 to I-80/90 |
Added Travel Lanes |
yes |
|
Madison |
Greenfield |
S9 |
2007 |
$8,563 |
2.13 mi south of I-69 (Fall Creek) to I-69 |
Median Construction |
no |
|
Madison |
Greenfield |
S9 |
2007 |
$12,329 |
0.2 mi north of SR 128 to SR 28 |
Median Construction |
yes |
|
Madison |
Greenfield |
U36 |
2008 |
$11,083 |
South jct with SR 9 to 2.1 mi north of SR 9 (Fall Creek) |
Added Travel Lanes |
yes |
|
Madison |
Greenfield |
S28 |
2011 |
$10,666 |
West Corp Ln of Elwood to SR 37 |
Median Construction |
no |
|
Madison |
Greenfield |
I69 |
2014 |
$70,000 |
SR 9/67 (Exit 22) to SR 67/32 (Exit 34) |
Added Travel Lanes |
no |
|
Madison |
Greenfield |
I69 |
2015 |
$70,000 |
SR 238 to SR 9/67 (Exit 22) |
Added Travel Lanes |
no |
|
Marion |
Greenfield |
U40 |
2006 |
$19,517 |
Grassy Creek to Buck Creek (1.57 mi W to 0.26 mi E of Marion/Hancock Co. Ln) |
Median Construction |
yes |
|
Marion |
Greenfield |
I465 |
2006 |
$12,360 |
At SR 37 (South Leg) |
interchange modification |
yes |
|
Marion |
Greenfield |
I465 |
2007 |
$8,936 |
At I-70 (East Leg) (Phase II) |
interchange modification |
no |
|
Marion |
Greenfield |
I465 |
2008 |
$69,690 |
At SR 67 and I-465 |
interchange modification |
no |
|
Marion |
Greenfield |
I465 |
2008 |
$179,341 |
I-465 West Leg from 0.8 mi E of SR 67/Kentucky Ave to 0.5 mi N of 46th St |
Added Travel Lanes |
yes |
|
Marion |
Greenfield |
I465 |
2008 |
$38,679 |
At I-74 and I-465 Interchange |
interchange modification |
no |
|
Marion |
Greenfield |
I465 |
2008 |
$122,608 |
At Airport Expressway and I-465 (W. Leg Interchange) |
interchange modification |
no |
|
Marion |
Greenfield |
I465 |
2008 |
$34,729 |
At US 36 and I-465 (W. Leg Interchange) |
interchange modification |
no |
|
Marion |
Greenfield |
I465 |
2008 |
$39,576 |
At West 38th St and I-465 Interchange |
interchange modification |
no |
|
Marion |
Greenfield |
U52 |
2008 |
$23,370 |
1.33 mi east of I-465 to Marion / Hancock Co Ln |
Added Travel Lanes |
yes |
|
Marion |
Greenfield |
I65 |
2008 |
$0 |
I-65/I-70 Market St Interchange Modification (Indianapolis will pay cost) |
interchange modification |
no |
|
Marion |
Greenfield |
I465 |
2009 |
$167,000 |
East of US 31 (North Leg) to 0.43 km north of Fall Creek Rd (East Leg) |
Added Travel Lanes |
yes |
|
Marion |
Greenfield |
I465 |
2009 |
$64,650 |
0.5 mi north of 46th Street to 0.3 mi north of I-65 (West Leg) |
Added Travel Lanes |
yes |
|
Marion |
Greenfield |
S67 |
2009 |
$4,109 |
Thompson Rd to I-465 |
Added Travel Lanes |
yes |
|
Marion |
Greenfield |
I65 |
2010 |
$25,650 |
0.5 mi south of Southport Rd to 0.25 mi south of I-465 (South Leg) |
Added Travel Lanes |
yes |
|
Marion |
Greenfield |
I70 |
2010 |
$31,720 |
0.6 mi east of Post Rd to 0.5 mi east of Mt. ComFort Rd |
Added Travel Lanes |
yes |
|
Marion |
Greenfield |
I465 |
2013 |
$60,000 |
0.5 mi north of 86th St (West Leg) to US 421 (North Leg) |
Added Travel Lanes |
no |
|
Marion |
Greenfield |
I69 |
2013 |
$34,000 |
From 96th Street to 116th Street/SR 37 |
Added Travel Lanes |
no |
|
Marion |
Greenfield |
I69 |
2013 |
$165,000 |
I-465 to 96th Street |
Added Travel Lanes |
yes |