Projects listed in both INDOT Survey & INDOT long range transportation plan - new construction projects only |
TOTAL COST = $6,178,986,000
|
|
|
|
|
|
|||
|
district |
road |
year |
cost (1,000s) |
location |
description |
On survey? |
|
|
Allen |
Fort Wayne |
U33 |
2005 |
$13,187 |
US 30 to Cook Rd |
Added Travel Lanes |
yes |
|
Allen |
Fort Wayne |
S1 |
2007 |
$12,018 |
I-69 to 0.21 mi east of Tonkle Rd, north of Fort Wayne |
Added Travel Lanes |
yes |
|
Allen |
Fort Wayne |
S3 |
2007 |
$33,295 |
Ludwig Rd to Dupont Rd |
Added Travel Lanes |
yes |
|
Allen |
Fort Wayne |
I69 |
2007 |
$36,930 |
0.48 mi south of Coldwater Rd to 0.86 mi north of SR 1 |
Added Travel Lanes |
yes |
|
Allen |
Fort Wayne |
S14 |
2008 |
$13,908 |
Scott Rd to Hadley Rd |
Added Travel Lanes |
yes |
|
Allen |
Fort Wayne |
U24 |
2008 |
$21,567 |
0.5 mi E. of I-469 to 0.5 mi E. of Ryan/Bruick Rd w/ interchange (Phase I) |
New Road Construction |
yes |
|
Allen |
Fort Wayne |
U24 |
2008 |
$25,113 |
0.5 mi W. of SR 101 to Indiana/Ohio State Ln w/ SR101 interchange (Phase 4) |
New Road Construction |
yes |
|
Allen |
Fort Wayne |
U30 |
2008 |
$1,790 |
US 33 to I-69 at Fort Wayne |
Added Travel Lanes |
yes |
|
Allen |
Fort Wayne |
U24 |
2009 |
$21,923 |
0.5 mi E. of Ryan/Bruick Rd to 0.5 mi E. of Webster Rd w/ interchange (Phase II) |
New Road Construction |
yes |
|
Allen |
Fort Wayne |
U24 |
2011 |
$22,000 |
From 0.5 mi east of Webster Rd to 0.5 mi west of SR 101 (Phase III) |
New Road Construction |
yes |
|
Allen |
Fort Wayne |
S930 |
2013 |
$8,000 |
2.6 mi west of I-469 (Lincoln Ave) to 0.7 mi west of I-469 (Minnich Rd) |
Added Travel Lanes |
yes |
|
Bartholomew |
Seymour |
U31 |
2006 |
$18,863 |
CR 50N, 1.48 mi south of old SR 46 to 2.46 mi north of old SR 46 |
Added Travel Lanes |
yes |
|
Bartholomew |
Seymour |
S46 |
2007 |
$4,090 |
State St from Marr Rd to Mapleton/Pence St in Columbus |
Median Construction |
yes |
|
Boone |
Crawfordsville |
U421 |
2005 |
$13,983 |
0.89 mi north of I-465 to 0.65 mi north of SR 334 (Phase 2) |
Added Travel Lanes |
yes |
|
Boone |
Crawfordsville |
U421 |
2011 |
$15,000 |
121st St to 146th St |
Added Travel Lanes |
yes |
|
Boone |
Crawfordsville |
I65 |
2013 |
$9,715 |
I-465 Northwest Connector to 0.5 mi north of SR 334 |
Added Travel Lanes |
yes |
|
Boone |
Crawfordsville |
I65 |
2013 |
$85,410 |
0.5 mi north of SR 334 to US 52 |
Added Travel Lanes |
yes |
|
Carroll |
LaPorte |
S25 |
2007 |
$70,829 |
0.2 mi E of Carroll CR400W to Cass CR300S (Segment 3) |
New Road Construction |
yes |
|
Carroll |
LaPorte |
S25 |
2007 |
$60,870 |
0.5 mi E of Tippecanoe/Carroll Co Ln to 0.2 mi E of Carroll CR 400W (Seg 2) |
New Road Construction |
yes |
|
Cass |
LaPorte |
S25 |
2006 |
$44,376 |
From Cass CR 300S to US 24/US 35 (Segment 4) |
New Road Construction |
yes |
|
Clark |
Seymour |
I265 |
2013 |
$101,376 |
Extend I-265 into Kentucky (Bridge) (Indiana share) |
New Bridge Construction |
yes |
|
Clark |
Seymour |
I65 |
2013 |
$249,600 |
New Ohio River Bridge |
New Bridge Construction |
yes |
|
Clark |
Seymour |
I65 |
2014 |
$34,110 |
0.5 mi south of SR 311 to 0.5 mi north of Memphis Rd |
Added Travel Lanes |
yes |
|
Clark |
Seymour |
I65 |
2015 |
$18,000 |
From 0.5 mi north of Memphis Rd to 0.5 mi north of SR 160 |
Added Travel Lanes |
yes |
|
Clinton |
Crawfordsville |
I65 |
2008 |
$8,400 |
At SR 28 (two additional lanes on SR 28 through the interchange) |
interchange modification |
yes |
|
Clinton |
Crawfordsville |
U421 |
2012 |
$2,283 |
Jackson St (SR 39) to Wabash St |
TSM |
yes |
|
Crawford |
Vincennes |
S145 |
2005 |
$24,283 |
3.5 mi N of Perry / Crawford Co Ln to SR 145, 1.9 mi N of SR 64 (Seg. 2) |
New Road Construction |
yes |
|
Daviess |
Vincennes |
I69 |
2018 |
$299,297 |
Section 3: I-69 from US 50 near Washington to US 231 near Crane Naval Center |
New Road Construction |
yes |
|
Dekalb |
Fort Wayne |
S8 |
2012 |
$5,500 |
SR 327 to 0.15 mi west of I-69 |
Added Travel Lanes |
yes |
|
Delaware |
Greenfield |
S32 |
2007 |
$12,540 |
CR 575W (AdaLn St) to CR 400W (Nebo Rd) in Yorktown |
Added Travel Lanes |
yes |
|
Delaware |
Greenfield |
S32 |
2008 |
$20,650 |
0.3 mi E of Muncie Bypass (Country Club Rd) to 4.2 mi E of Muncie Bypass |
Median Construction |
yes |
|
Delaware |
Greenfield |
S67 |
2008 |
$7,600 |
US 35 / SR 3 to the south jct with SR 28 |
Median Construction |
yes |
|
Delaware |
Greenfield |
S67 |
2008 |
$4,730 |
At Norfolk Southern RR, 2.11 km south of SR 3 |
New Bridge Construction |
yes |
|
Delaware |
Greenfield |
S67 |
2009 |
$17,000 |
South jct with SR 28 to SR 167 |
Median Construction |
yes |
|
Delaware |
Greenfield |
I69 |
2009 |
$5,600 |
At SR 67 (Exit 34-Daleville) |
interchange modification |
yes |
|
Delaware |
Greenfield |
S67 |
2011 |
$9,779 |
At Cowan Rd, 2.07 mi west of SR 3 |
New Interchange Construction |
yes |
|
Delaware |
Greenfield |
S32 |
2024 |
$12,000 |
4.5 mi E of US 35 (CR 650E) to 7.1 mi E of US 35 WCL Parker City |
Added Travel Lanes |
yes |
|
Dubois |
Vincennes |
U231 |
2011 |
$139,316 |
Huntingburg / Jasper Connector |
New Road Construction |
yes |
|
Elkhart |
Fort Wayne |
U33 |
2005 |
$9,847 |
CR 15 to US 20 |
Added Travel Lanes |
yes |
|
Elkhart |
Fort Wayne |
U33 |
2010 |
$11,418 |
College Ave to Monroe St in Goshen |
Added Travel Lanes |
yes |
|
Elkhart |
Fort Wayne |
U33 |
2010 |
$21,320 |
CR 40 to College Ave (CR 36) |
Added Travel Lanes |
yes |
|
Elkhart |
Fort Wayne |
U33 |
2010 |
$4,448 |
Monroe St to SR 15 (Main St in Goshen) |
Added Travel Lanes |
yes |
|
Elkhart |
Fort Wayne |
U20 |
2015 |
$9,485 |
1.25 mi east of CR 19 to SR 15 |
Added Travel Lanes |
yes |
|
Floyd |
Seymour |
S111 |
2009 |
$6,350 |
Beechwood Ave to Mt. Tabor Rd |
Added Travel Lanes |
yes |
|
Floyd |
Seymour |
I64 |
2014 |
$11,200 |
I-265 to SR 111 |
Added Travel Lanes |
yes |
|
Gibson |
Vincennes |
I69 |
2018 |
$347,183 |
Section 2: I-69 from SR 64 near Oakland City to US 50 near Washington |
New Road Construction |
yes |
|
Gibson |
Vincennes |
I69 |
2018 |
$155,634 |
Section 1: I-69 from I-64/SR57 Interchange to SR 64 near Oakland City |
New Road Construction |
yes |
|
Greene |
Vincennes |
I69 |
2018 |
$177,781 |
Section 4(a): I-69 from US 231 Crane Naval Ctr to Vincennes/Seymour Dist Ln |
New Road Construction |
yes |
|
Greene |
Seymour |
I69 |
2020 |
$145,458 |
Section 4(b): I-69 from Vincennes/Seymour Dist Ln to SR 37 SW of Bloomington |
New Road Construction |
yes |
|
Hamilton |
Greenfield |
S32 |
2006 |
$11,870 |
2.58 km west of US 31 to US 31 |
Added Travel Lanes |
yes |
|
Hamilton |
Greenfield |
S431 |
2007 |
$22,620 |
96th St to US 31 |
Added Travel Lanes |
yes |
|
Hamilton |
Greenfield |
U31 |
2012 |
$483,000 |
From 0.2 mi south of I-465 to SR 38 Hamilton Co |
freeway Upgrade |
yes |
|
Hamilton |
Greenfield |
S32 |
2014 |
$6,546 |
US 31 to Moontown Rd |
Added Travel Lanes |
yes |
|
Hamilton |
Greenfield |
I69 |
2014 |
$30,000 |
From 116th Street/SR 37 to SR 238 |
Added Travel Lanes |
yes |
|
Hancock |
Greenfield |
I70 |
2006 |
$9,200 |
At Mt. ComFort Rd, 7.7 mi west of SR 9 |
interchange modification |
yes |
|
Hancock |
Greenfield |
U52 |
2008 |
$22,652 |
Marion / Hancock Co Ln to CR 500W |
Added Travel Lanes |
yes |
|
Hancock |
Greenfield |
I70 |
2010 |
$51,310 |
0.5 mi east of Mt. ComFort Rd to 0.8 mi east of SR 9 |
Added Travel Lanes |
yes |
|
Harrison |
Seymour |
I64 |
2015 |
$14,400 |
Placeholder for New Interchange W of SR 135 |
interchange |
yes |
|
Hendricks |
Crawfordsville |
U36 |
2011 |
$44,400 |
SR 267 to I-465 |
Added Travel Lanes |
yes |
|
Hendricks |
Crawfordsville |
I74 |
2011 |
$9,000 |
At Hendricks Co North-South Corridor (CR 1000E) |
New Interchange Construction |
yes |
|
Howard |
Greenfield |
U35 |
2006 |
$36,050 |
Goyer Rd to Wildcat Creek, 0.5 mi east of US 31 to 6.7 mi east of US 31 |
Added Travel Lanes |
yes |
|
Howard |
Greenfield |
U31 |
2015 |
$130,000 |
South of SR 26 to SR 18 |
New Road Construction |
yes |
|
Jay |
Greenfield |
S67 |
2007 |
$11,200 |
1.59 mi south of SR 26 to US 27 |
Median Construction |
yes |
|
Jefferson |
Seymour |
S62 |
2008 |
$10,029 |
SR 56 to Clifty Creek |
Added Travel Lanes |
yes |
|
Jefferson |
Seymour |
S250 |
2010 |
$10,000 |
From SR 7 to US 421 |
New Road Construction |
yes |
|
Jennings |
Seymour |
U50 |
2011 |
$9,000 |
Western UAB of North Vernon to 2.0 mi E of eastern UAB of North Vernon |
Added Travel Lanes |
yes |
|
Jennings |
Seymour |
U50 |
2011 |
$26,000 |
US 31 to the western UAB of North Vernon (RP 115+63) |
Added Travel Lanes |
yes |
|
Johnson |
Seymour |
S135 |
2008 |
$7,944 |
CR 700N (Stones Crossing Rd) to Smith Valley Rd |
Added Travel Lanes |
yes |
|
Johnson |
Seymour |
S135 |
2009 |
$10,700 |
SR 144 to Stones Crossing Rd |
Added Travel Lanes |
yes |
|
Johnson |
Seymour |
I65 |
2010 |
$30,930 |
0.5 mi S of Whiteland Rd to 0.5 mi S of Greenwood Rd |
Added Travel Lanes |
yes |
|
Johnson |
Seymour |
I65 |
2010 |
$11,000 |
0.5 mi S of Greenwood Rd (Main St) to 0.5 mi S of Co Ln Rd |
Added Travel Lanes |
yes |
|
LaGrange |
Fort Wayne |
S5 |
2017 |
$5,000 |
From US 20 to SR 120 |
TSM |
yes |
|
Lake |
LaPorte |
S2 |
2005 |
$6,410 |
At I-65 |
Added Travel Lanes |
yes |
|
Lake |
LaPorte |
I80 |
2006 |
$106,585 |
At I-65 (0.4 mi west of Martin Luther King Dr to Central Ave) (Phase IV) |
interchange modification |
yes |
|
Lake |
LaPorte |
S53 |
2009 |
$16,160 |
109th Ave to 93rd Ave in Crown Point |
Added Travel Lanes |
yes |
|
Lake |
LaPorte |
S53 |
2017 |
$1,400 |
93rd Ave to US 30 |
TSM |
yes |
|
LaPorte |
LaPorte |
U20 |
2006 |
$475 |
Reconstruct ramp from EB US 20 to EB US 20/35 |
interchange modification |
yes |
|
LaPorte |
LaPorte |
U421 |
2009 |
$3,187 |
South jct with SR 2 to north jct with SR 2 in Westville |
Added Travel Lanes |
yes |
|
LaPorte |
LaPorte |
U421 |
2012 |
$10,900 |
South jct with SR 2 to north jct with SR 2 in Westville |
Added Travel Lanes |
yes |
|
LaPorte |
LaPorte |
U421 |
2013 |
$4,819 |
North jct with SR 2 to I-80/90 |
Added Travel Lanes |
yes |
|
Madison |
Greenfield |
S9 |
2007 |
$12,329 |
0.2 mi north of SR 128 to SR 28 |
Median Construction |
yes |
|
Madison |
Greenfield |
U36 |
2008 |
$11,083 |
South jct with SR 9 to 2.1 mi north of SR 9 (Fall Creek) |
Added Travel Lanes |
yes |
|
Marion |
Greenfield |
U40 |
2005 |
$32,393 |
Franklin Rd to Grassy Creek (1.57 mi west of Marion/Hancock Co Ln) |
Added Travel Lanes |
yes |
|
Marion |
Greenfield |
I465 |
2005 |
$24,000 |
At 71st St, 1.02 mi north of I-65 (West Leg) |
interchange modification |
yes |
|
Marion |
Greenfield |
I465 |
2005 |
$650 |
From I-69/465 interchange to 0.43 mi north of Fall Creek Rd |
Added Travel Lanes |
yes |
|
Marion |
Greenfield |
U40 |
2006 |
$19,517 |
Grassy Creek to Buck Creek (1.57 mi W to 0.26 mi E of Marion/Hancock Co. Ln) |
Median Construction |
yes |
|
Marion |
Greenfield |
I465 |
2006 |
$12,360 |
At SR 37 (South Leg) |
interchange modification |
yes |
|
Marion |
Greenfield |
I465 |
2008 |
$179,341 |
I-465 West Leg from 0.8 mi E of SR 67/Kentucky Ave to 0.5 mi N of 46th St |
Added Travel Lanes |
yes |
|
Marion |
Greenfield |
U52 |
2008 |
$23,370 |
1.33 mi east of I-465 to Marion / Hancock Co Ln |
Added Travel Lanes |
yes |
|
Marion |
Greenfield |
I465 |
2009 |
$167,000 |
East of US 31 (North Leg) to 0.43 km north of Fall Creek Rd (East Leg) |
Added Travel Lanes |
yes |
|
Marion |
Greenfield |
I465 |
2009 |
$64,650 |
0.5 mi north of 46th Street to 0.3 mi north of I-65 (West Leg) |
Added Travel Lanes |
yes |
|
Marion |
Greenfield |
S67 |
2009 |
$4,109 |
Thompson Rd to I-465 |
Added Travel Lanes |
yes |
|
Marion |
Greenfield |
I65 |
2010 |
$25,650 |
0.5 mi south of Southport Rd to 0.25 mi south of I-465 (South Leg) |
Added Travel Lanes |
yes |
|
Marion |
Greenfield |
I70 |
2010 |
$31,720 |
0.6 mi east of Post Rd to 0.5 mi east of Mt. ComFort Rd |
Added Travel Lanes |
yes |
|
Marion |
Greenfield |
I69 |
2013 |
$165,000 |
I-465 to 96th Street |
Added Travel Lanes |
yes |
|
Marion |
Greenfield |
I74 |
2013 |
$4,409 |
At Post Rd |
interchange modification |
yes |
|
Marion |
Greenfield |
I65 |
2014 |
$53,310 |
Raymond St to I-70 South Split |
Added Travel Lanes |
yes |
|
Marion |
Greenfield |
I65 |
2014 |
$15,660 |
0.5 mi S of Co Ln Rd to 0.5 mi S of Southport Rd |
Added Travel Lanes |
yes |
|
Marshall |
LaPorte |
U31 |
2011 |
$20,000 |
US 30 to 2.63 mi S of US 6 (CR W4-A) |
freeway Upgrade |
yes |
|
Monroe |
Seymour |
S45 |
2005 |
$2,900 |
0.1 mi east of SR 46 to 0.1 mi east of Pete Ellis Dr |
Added Travel Lanes |
yes |
|
Monroe |
Seymour |
S48 |
2005 |
$10,956 |
2.5 mi west of SR 37 to 0.6 mi west of SR 37 |
Added Travel Lanes |
yes |
|
Monroe |
Seymour |
S46 |
2006 |
$21,541 |
Walnut St to 3rd St in Bloomington (SR 45/46 Bypass) |
Added Travel Lanes |
yes |
|
Monroe |
Seymour |
S45 |
2009 |
$1,110 |
Pete Ellis Dr to Russell Rd |
Added Travel Lanes |
yes |
|
Monroe |
Seymour |
I69 |
2020 |
$263,380 |
Section 5: I-69 from SR 37 SW of Bloomington to SR 39 |
New Road Construction |
yes |
|
Morgan |
Seymour |
S144 |
2005 |
$2,290 |
0.2 mi east of SR 67 to Johnson Rd (CR 400E) |
Median Construction |
yes |
|
Morgan |
Seymour |
S39 |
2006 |
$16,536 |
0.8 mi north of SR 37 to 2.7 mi north of SR 37 |
Added Travel Lanes |
yes |
|
Morgan |
Seymour |
I69 |
2017 |
$311,267 |
Section 6: I-69 from SR 39 to I-465 |
New Road Construction |
yes |
|
Noble |
Fort Wayne |
U6 |
2005 |
$7,314 |
West jct with SR 3 to the east jct with SR 3 |
Added Travel Lanes |
yes |
|
Orange |
Vincennes |
S37 |
2009 |
$14,080 |
Western Paoli Connector |
New Road Construction |
yes |
|
Perry |
Vincennes |
S66 |
2005 |
$5,805 |
1.8 mi east of east jct with SR 37 to 0.1 mi west of west jct with SR 237 |
Added Travel Lanes |
yes |
|
Porter |
LaPorte |
U6 |
2005 |
$25,705 |
0.036 mi east of SR 51 to Scottsdale Rd, 2.44 mi west of SR 149 |
Added Travel Lanes |
yes |
|
Porter |
LaPorte |
U6 |
2005 |
$15,718 |
Scottsdale Rd, 2.44 mi west of SR 149 to SR 149 |
Added Travel Lanes |
yes |
|
Porter |
LaPorte |
S49 |
2008 |
$5,210 |
At CR 400N, 1.58 mi north of SR 2 |
New Interchange Construction |
yes |
|
Randolph |
Greenfield |
S32 |
2007 |
$8,390 |
US 27 to CR 300E, 2.7 mi east of US 27 |
Median Construction |
yes |
|
Rush |
Greenfield |
S3 |
2008 |
$5,724 |
0.3 mi south of SR 44 to 1.6 mi north of SR 44 (except SR 44 to 4th St) |
Median Construction |
yes |
|
Shelby |
Greenfield |
S44 |
2006 |
$12,855 |
1.95 mi west of I-74 to 1.1 mi east of I-74 |
Median Construction |
yes |
|
Spencer |
Vincennes |
U231 |
2005 |
$25,566 |
SR 162 to SR 62 (Phase IVA) |
New Road Construction |
yes |
|
Spencer |
Vincennes |
U231 |
2005 |
$5,855 |
At SR 62 (Phase IVB) |
New Road Construction |
yes |
|
Spencer |
Vincennes |
U231 |
2005 |
$18,060 |
CR 1250N to SR 162 (Phase III) |
New Road Construction |
yes |
|
Spencer |
Vincennes |
U231 |
2005 |
$37,280 |
SR 70 to CR 1250N (Phase II) |
New Road Construction |
yes |
|
Spencer |
Vincennes |
U231 |
2005 |
$34,670 |
SR 62 to CR 2050N (Phase V) |
New Road Construction |
yes |
|
Spencer |
Vincennes |
S66 |
2006 |
$36,400 |
2.54 mi west of SR 161 to east jct with US 231 |
Added Travel Lanes |
yes |
|
St Joseph |
LaPorte |
U31 |
2011 |
$20,000 |
From Kern Rd to 0.557 mi S of US 20 (Johnson Rd) |
New Road Construction |
yes |
|
St Joseph |
LaPorte |
U31 |
2011 |
$18,000 |
At US 31 & Kern Rd (1.2 mi S of US 20) |
Interchange Construction |
yes |
|
St Joseph |
LaPorte |
U31 |
2011 |
$104,000 |
From 0.557 mi S of US 20 (Johnson Rd) to the US 20 Bypass |
Added Travel Lanes |
yes |
|
St Joseph |
LaPorte |
U31 |
2011 |
$120,000 |
From 2.63 mi S of US 6 (CR W4A) to 1.2 mi S of US 20 (Kern Rd) |
New Road Construction |
yes |
|
Tippecanoe |
Crawfordsville |
U231 |
2005 |
$27,278 |
0.5 mi north of Wabash River to SR 26 |
New Road Construction |
yes |
|
Tippecanoe |
Crawfordsville |
I65 |
2007 |
$1,510 |
At SR 26 |
interchange modification |
yes |
|
Tippecanoe |
Crawfordsville |
U231 |
2008 |
$15,310 |
SR 26 to US 52 (around the west side of Lafayette) |
New Road Construction |
yes |
|
Tippecanoe |
Crawfordsville |
S25 |
2009 |
$72,436 |
I-65/SR25 interchange to 0.5 mi E of Tippecanoe/Carroll Co Ln (Segment 1) |
New Road Construction |
yes |
|
Vanderburgh |
Vincennes |
U41 |
2006 |
$45,913 |
Just south of north jct with SR 66 (Diamond Ave) to Mt. Pleasant Rd |
Added Travel Lanes |
yes |
|
Vanderburgh |
Vincennes |
S66 |
2006 |
$16,043 |
At Burkhardt Rd, 1.2 mi west of I-164 |
New Interchange Construction |
yes |
|
Vanderburgh |
Vincennes |
S62 |
2008 |
$48,600 |
East end Pigeon Creek Bridge to apx. 300' west of 1st Ave. Bridge |
new interchange |
yes |
|
Vanderburgh |
Vincennes |
I69 |
2012 |
$250,000 |
Placeholder for Henderson to Evansville Study Recommendation |
New Road Construction |
yes |
|
Vanderburgh |
Vincennes |
U41 |
2016 |
$7,500 |
I-164 to Virginia Ave 0.32 mi N of SR 62/66 (Lloyd Expwy) |
Added Travel Lanes |
yes |
|
Vanderburgh |
Vincennes |
U41 |
2023 |
$22,830 |
Mt. Pleasant Rd to I-64 |
Added Travel Lanes |
yes |
|
Wabash |
Fort Wayne |
S15 |
2007 |
$4,700 |
Stitt St to W Harrison St in Wabash |
Median Construction |
yes |
|
Warrick |
Vincennes |
S66 |
2005 |
$27,782 |
SR 662 to Yankeetown Rd (Phase III) |
Added Travel Lanes |
yes |
|
Warrick |
Vincennes |
S66 |
2005 |
$16,622 |
Just east of SR 261 to SR 662 (Phase II) |
Added Travel Lanes |
yes |
|
Warrick |
Vincennes |
S261 |
2006 |
$7,045 |
SR 66 to Jenner Rd (CR 150S), 2.9 mi north of SR 66 |
Added Travel Lanes |
yes |
|
Warrick |
Vincennes |
S61 |
2012 |
$6,000 |
Placeholder for the SR 61 Boonville Connector EA/NEPA (assessment) |
New Road Construction |
yes |
|
Washington |
Seymour |
S60 |
2007 |
$5,595 |
SR 56 (east of Salem at Quaker Rd) south to SR 60 |
New Road Construction |
yes |
|
Wayne |
Greenfield |
U27 |
2005 |
$12,015 |
2.06 mi south of I-70 to 0.1 mi south of I-70 |
Median Construction |
yes |
|
Wayne |
Greenfield |
I70 |
2005 |
$11,360 |
At US 27 |
interchange modification |
yes |
|
Wayne |
Greenfield |
U35 |
2008 |
$5,442 |
I-70 to 0.1 mi north of SR 38 |
Added Travel Lanes |
yes |